- 0:00–0:06
Define one offline task • Form A needs offline entry. • Form A · Illustrative plan • Must-have • Form A • Offline form
Form A is an illustrative offline-entry requirement. Its record moves into the Must-have document below the fixed heading. Offline form describes the work needed; no data is saved or synced.
- 0:06–0:12
Plan the device test • Use customer devices. • Form A · Illustrative plan • Prototype planned • Customer devices • Form A
The same Form A first enters Prototype planned, then moves to Customer devices planning. The customer-device destination appears for the second handoff. The requirement travels between plans, without running a prototype or testing a device.
- 0:12–0:18
Leave results open • Plan language and access checks. • Form A · Illustrative plan • Test record • Form A • Not tested • Arabic + English • Accessibility planned
Form A enters an empty Test record. The artwork reads Not tested throughout. Arabic + English and Accessibility planned take separate reading windows beside the record. These labels request future checks; they are not successful language, device or screen-reader results.
- 0:18–0:24
Plan the next retest • Include ongoing work. • Form A · Illustrative plan • Initial build • Ongoing work • Platform changes • Retesting • Form A
Initial build stays separate from Ongoing work. A downward route inside ongoing work links Platform changes to Retesting. Form A moves through a clear lane into the retest requirement. Neither the arrow nor the movement performs a test or establishes platform support.
- 0:24–0:30
Keep the choice pending • Review evidence before choosing. • Form A · Illustrative plan • Test record • Form A • Not tested • PWA • Native app • Decision pending
Form A returns from the retest requirement to a common Test record, whose artwork still reads Not tested. Two equally weighted empty option sheets, PWA and Native app, appear below their fixed labels. Decision pending appears in a separate footer after the carrier clears its lane and remains unresolved; no record moves into a chosen option.
A silent illustrative plan follows one offline form through a proposed prototype, customer-device checks, an empty evidence record and a pending implementation choice. No test has been performed.
Read the article: PWA vs Native App in 2026: Decide with Evidence from Your Users' Devices