TecnoStack
Start a projectالعربية

Silent video with on-screen text. The transcript below repeats every screen and describes what it shows.

  1. 0:00–0:06

    Start with one booking task • Write what the first release must do. • Booking A • Booking • Scope to agree • Quote pending

    The illustrative Booking screen stays inside Booking A while a reference reaches Scope to agree. Quote pending remains visible. The task supplies the scope; no quote is approved.

  2. 0:06–0:12

    Count each screen's states • Empty, loading, error and success need a design. • Booking A • Booking • Empty • Loading • Error • Success

    Four independent references connect Booking A to Empty, Loading, Error and Success. These are alternative screen states that need design and implementation, not steps in a sequence or results of an executed test.

  3. 0:12–0:18

    Define the work around the screen • Include languages, roles and documented integrations. • Booking A · To agree • Arabic + English • Roles • Integrations

    Arabic + English, Roles and Integrations move on separate rows into Booking A · To agree. The cards identify requirements to specify; they do not increase any plan allowance.

  4. 0:18–0:24

    List costs outside the build • Confirm accounts, hosting, upkeep and backend changes. • Build scope • Separate costs • Store accounts • Hosting and usage • Ongoing maintenance • Backend changes

    Build scope stays inside its own isolated record while Store accounts, Hosting and usage, Ongoing maintenance and Backend changes move fully into Separate costs along distinct lanes. The article distinguishes ongoing maintenance from its included defect-fix period. No total or shared payment frequency is shown.

  5. 0:24–0:30

    Compare the same app scope • Agree the exclusions and who owns each account. • Same scope • Quote A • Quote B • Booking A • Store approval is external

    Two equivalent Booking A copies start inside the common Same scope source and move into the bounded bodies of Quote A and Quote B below their titles. Store approval is external stays separate beneath all three panels. Compare equivalent requirements and exclusions; Apple and Google decide eligibility and approval.

A silent illustrative guide to app screen states, scope requirements and expenses outside the build.

Read the article: How Much Does App Development Cost in Saudi Arabia? Prices and a Scope Checklist