Plan the scope for Post A Silent video. [0–6] Plan Post A • Post A • Illustrative example • Monthly scope • Posts + replies Post A is an illustrative draft. The same paper settles into Monthly scope while Posts + replies describes the planning context. The connection is a planning relationship, not a published post or a new package promise. [6–12] Count both versions • Post A • Illustrative example • Shared total • Arabic • English The Post A paper stays in place. Its Arabic and English version records follow independent routes into one bounded Shared total. Both records remain in separate rows or columns: neither is an alternative or a free extra. No numerical allowance is specified. [12–18] Separate ad spend • Post A • Illustrative example • Monthly scope • Ad spend • Platform Post A remains within the Monthly scope context. A separate Ad spend document points to Platform across a clear gap. The arrow identifies the external advertising cost boundary; it is not a payment, an included amount or a published advertisement. [18–24] Choose language reviewers • Post A • Illustrative example • Your team • Pending • Arabic • English Post A stays visible. Arabic and English records move in separate lanes toward Your team beneath fixed language labels. Pending remains visible: the client must identify the appropriate language reviewers, and no review has been completed. [24–30] Approval first • Post A • Illustrative example • Pending • Publishing Post A approaches the closed gate marked Pending and stops on its near side. Publishing is an empty destination beyond the barrier, with no outgoing route or published post. Approval first states the unresolved prerequisite; no approval or publication occurs.