Follow one SEO page change Silent video. [0–6] Start with one page • Illustrative example • Page A • Agreed work A page illustration enters the agreed monthly scope as Page A. [6–12] Approve the proposed change • Check the wording first • Proposed wording • Approval owner • Page A The proposed Page A wording moves to the approval owner before implementation. [12–18] Apply the agreed wording • Inside the existing CMS • Approved change • CMS work • Page A The approved change moves into the CMS work step. [18–24] Record the delivered change • Keep the page URL • Completed change • Delivery log • Page A Page A moves into the delivery log, linking the work to its page. [24–30] Check the live page • Delivery is not a ranking result • Delivery entry • Live-page review • Page A The delivery entry moves to live-page review. This is a proposed acceptance check, not a measured search result.