Measuring an internal AI copilot pilot in 30 seconds Silent video: no voiceover, music or sound effects. This transcript repeats every on-screen word and describes each scene. The film includes the topic label "Copilot pilot measurement", the note "Illustrative diagram", the TecnoStack logo and progress numbers 1, 2, 3, 4, 5, 6. Elements enter and leave during transitions; in portrait, the closing sign-off replaces the footer. [0:00–0:05] Beat 1 of 6 (intro) Kicker: PILOT MEASUREMENT Headline: Did the pilot create value? Support: Compare quality, effort and cost Diagram (decision paths): Pilot; Usage; Accepted output / cost Connections: Pilot → Usage; Pilot → Accepted output / cost Highlighted: Accepted output / cost Scene: Branching diagram: Pilot, Usage, Accepted output / cost. Connections: Pilot to Usage; Pilot to Accepted output / cost. Emphasis: Accepted output / cost. [0:05–0:10] Beat 2 of 6 (step1) Kicker: 01 Headline: Measure a fair baseline Support: Compare similar tasks and users Diagram (flow): Plan; Baseline; Pilot; Decision Connections: Plan → Baseline; Baseline → Pilot; Pilot → Decision Highlighted: Baseline Scene: Flow: Plan, Baseline, Pilot, Decision. Connections: Plan to Baseline; Baseline to Pilot; Pilot to Decision. Emphasis: Baseline. [0:10–0:15] Beat 3 of 6 (step2) Kicker: 02 Headline: Track every attempt Support: Count edits, failures and fallback Diagram (decision paths): Output; Accepted; Edited; Rejected Connections: Output → Accepted; Output → Edited; Output → Rejected Highlighted: Edited Scene: Branching diagram: Output, Accepted, Edited, Rejected. Connections: Output to Accepted; Output to Edited; Output to Rejected. Emphasis: Edited. [0:15–0:20] Beat 4 of 6 (step3) Kicker: 03 Headline: Count the full cost Support: Include review and maintenance Diagram (evidence checklist): Model / hosting; Integration; Review time; Support Highlighted: Review time Scene: Comparison without scores: Model / hosting, Integration, Review time, Support. Emphasis: Review time. [0:20–0:25] Beat 5 of 6 (step4) Kicker: 04 Headline: Compare simpler alternatives Support: Use the same success criteria Diagram (hub and spokes): Copilot; Search; Templates; Existing software Connections: Copilot → Search; Copilot → Templates; Copilot → Existing software Highlighted: Copilot Scene: Network: Copilot, Search, Templates, Existing software. Connections: Copilot to Search; Copilot to Templates; Copilot to Existing software. Emphasis: Copilot. [0:25–0:30] Beat 6 of 6 (close) Kicker: TECNOSTACK Headline: Decide on evidence Support: Time saved is not automatically cash Diagram (decision paths): Evidence; Scale; Adjust; Stop Connections: Evidence → Scale; Evidence → Adjust; Evidence → Stop Highlighted: Evidence Sign-off: TecnoStack logo and tecnostack.com Scene: Branching diagram: Evidence, Scale, Adjust, Stop. Connections: Evidence to Scale; Evidence to Adjust; Evidence to Stop. Emphasis: Evidence.